The tests performed on the HEPD-FM have been:
- Mechanical Tests (17-18 October 2016);
- Thermal Tests (18 October – 8 November 2016);
- Thermovacuum Tests (21-26 November 2016);
- EMI-EMC Tests;
- Functional Tests.
Functional tests were performed in clean room of INFN Tor Vergata. A beam test campaign with electrons was performed at BTF facility at INFN-LNF from 3 to 5 October 2016 and a beam test with protons was performed at APSS Proton Therapy (Trento) from 8 to 12 November 2016.